ADU Cost Estimator - Quick Draw Design and Build Co.

ADU Cost Estimator

You don't like the sales pitch. Neither do we.

Here's an instant estimate — no forms, no callbacks, no pressure. Many details affect these numbers, but if you'd like a second opinion and you're in San Diego, we'll review your plans and walk your site to verify these figures for free.

Project Details

Natural Gas

Include gas service in estimate

Dimensions

Dwelling units

Footprint of the structure

Heated/cooled interior space

All framed area including garages, covered patios

Total roof surface area including overhangs

Balconies and decks requiring waterproofing

Rooms

Medium (80–150 sq ft)

Construction Total

—

Structure · Exterior · MEP · Interior

Enter foundation and living area to see estimate

Construction Costs

Foundation

Slab-on-grade or raised floor foundation

—

Framing

Wood framing and structural hardware

—

Insulation

Batt and blown insulation

—

Roofing

Composition shingle or flat roof system

—

Stucco

3-coat stucco system

—

Windows

Vinyl dual-pane windows

—

Exterior Doors

Exterior entry doors

—

Deck Waterproofing

Waterproofing membrane and coating

—

Gutters

Aluminum gutters and downspouts

—

Plumbing

Rough-in and finish plumbing

—

Electrical

Wiring, panels, and fixtures

—

HVAC

Mini-split or ducted HVAC system

—

Water Heaters

Tankless or tank water heater

—

Drywall

Hang, tape, texture, and prime

—

Interior Doors

Interior passage doors

—

Cabinets

Semi-custom kitchen cabinets

—

Countertops

Quartz or granite countertops

—

Flooring

LVP or tile flooring

—

Paint

Interior and exterior paint

—

Appliances

Standard appliance package

—

Plumbing Fixtures

Faucets, toilets, and accessories

—

Finish Work

Trim, baseboards, casing, and hardware

—

Shower Doors

Frameless or semi-frameless shower enclosure

—

Tub / Shower Tile

Tile labor and material

—

Laundry

Hookups, enclosure, and connections

—

Soft Costs

Plans

Architectural and structural drawings

—

Management

Project management and overhead

—

Miscellaneous

Contingency and miscellaneous items

—

Other Possible Expenses

These costs vary widely depending on your site conditions, existing utility connections, and local jurisdiction. Some may not apply to your project at all — others could be significantly higher. We flag them separately so they don't distort the construction estimate above.

Demo & Grading

Demolition and site grading

—

Flatwork / Concrete

Concrete walkways and flatwork

—

Electric Service

Utility connection and panel upgrade

—

Gas Service

Gas meter and service line

—

Water Service

Water meter and service connection

—

Sewer Service

Sewer lateral connection

—

Permits

City permit fees — varies significantly by jurisdiction

—

This estimate is for budgeting purposes only. Actual costs vary based on site conditions, material selections, and current market pricing. Contact us for a detailed project quote.